Home › Timesheet template › Biweekly
Biweekly Timesheet Template
A biweekly timesheet is two weekly timesheets on one sheet: fourteen days, two week-blocks, each with its own total — because overtime is worked out one workweek at a time and never averaged across the pay period. This free biweekly timesheet template is the two-week layout in depth: the columns, the per-week subtotals, the overtime trap, the pay-period boundary, and the routine that turns two weeks of work into paid invoices.
Most biweekly timesheet templates are built for employees clocking in and out for payroll. This one is built for the person who bills by the hour: the client and the project come first, because those are what the invoice is organized by. Every section below ends at the same place — the invoice. Billia does not make a timesheet app, and this page does not pretend otherwise: it is the template itself, laid out so you can copy it into a spreadsheet in two minutes and print it, and the free invoice generator is where the two weeks’ hours become the invoices. For the overview of both layouts, see the free timesheet template — weekly and biweekly side by side. For the one-week layout in depth, see the weekly timesheet template.
The freelancer’s biweekly timesheet (two weeks, two totals)
A biweekly timesheet covers fourteen days — Monday of week 1 through Sunday of week 2 — but treat it as two weekly blocks stacked on one sheet, not one long 14-day list. Each block has its own rows, its own subtotal per client, and its own week total. Then, at the bottom, one period total for the two weeks together. The two week totals are the point of the layout: the invoice needs per-client totals, overtime needs per-week totals, and a single 80-hour period total answers neither question.
The header names the period: your name or business, the client or clients, the two weeks the sheet covers — start and end dates, not “last two weeks” — the rates in play, your rounding policy, and the workweek definition: which day the week starts. The workweek definition is the piece people skip, and on a biweekly sheet it is the piece the overtime math depends on — a workweek is a fixed, regularly recurring seven-day block, Monday to Sunday or Sunday to Saturday, and if the client’s workweek starts on a different day than your sheet does, the two weeks misalign and the overtime split comes out wrong.
Biweekly fits clients who pay on a two-week cycle — use it when the client’s payroll runs that way, not because the sheet looks tidier. Weekly is the freelancer default, and it is the one to start with: invoices go out faster, disputes surface while the work is still fresh, and a weekly rhythm makes late payment visible in days instead of months. But when the client pays every two weeks, matching their cycle means one invoice per period instead of two, one timesheet to attach instead of two, and no week left hanging between invoices.
Do not confuse the timesheet period with the pay period. A biweekly timesheet is a record of two weeks of work; the invoice terms — net 7, net 14, due on receipt — are a separate decision, set on the invoice itself. The timesheet records the hours; the invoice sets the deadline.
What goes on every row
Every row on a biweekly timesheet needs the same eight columns as the weekly sheet. They are the same columns because the row is the same thing — one block of work, for one client, on one project — what changes on the biweekly sheet is the footer, which carries a subtotal per client per week, a total per week, and then the period total, so each week and the period as a whole can be checked on their own.
| Column | What goes in it |
|---|---|
| Date | The calendar day the work happened |
| Client | Who is being billed for this row |
| Project | Which engagement the work belongs to |
| Description | What you did, specific enough for the client to recognize |
| Hours | Duration as a decimal — 1.5, never 1:30 |
| Rate | Your hourly rate for this client or project |
| Billable | Yes or no — the client pays for this row or not |
| Amount | Hours × rate on billable rows; $0 on the rest |
One row per day, per client and project. That is the rule that makes any timesheet work: Monday for Acme is one row, Tuesday for Acme is another, and if Tuesday also had two hours for a second client, Tuesday gets a second row. A day with two clients is two rows, never one row with two clients crammed into it — the moment a row holds two clients, the per-client subtotals stop adding up, and the invoice they feed stops being checkable. On a biweekly sheet the rule matters twice over, because a row in the wrong week’s block corrupts that week’s total as well as the client’s.
The description is where most timesheets fail. “Website work, 4 hours” is not a record a client can approve — it is a dispute waiting to happen. Write the description the way the client will read it on the invoice: “Homepage layout — hero, services, testimonials” instead of “design.” Specific enough that the client recognizes the work when they see the invoice; short enough that logging it takes ten seconds.
Write hours as decimals, always. 1.5 means an hour and a half; 0.25 is a quarter hour. Never write 1:30 — to a spreadsheet, 1:30 is a time of day, a fraction of 24 hours, and every sum after it comes out wrong. The classic error is typing minutes straight in as decimals: 1 hour 20 minutes is 1.33 hours, not 1.20. For the full rounding table and the rounding policy — 15-minute increments as the freelancer default, 6-minute for legal and professional services — see the weekly timesheet template, which covers decimal hours and rounding in depth.
Log daily, not on day 14. By the end of the second week, the first week’s hours have blurred, and the hours you cannot remember are hours you cannot bill. A notes app entry at the end of each work block beats a perfect spreadsheet you fill in once a fortnight. And total week 1 the day it ends — do not wait until day 14 to total either week. A week totalled while the week is still fresh is a fact; a week totalled two weeks later is a reconstruction.
Keep the non-billable rows. A standup call, a proposal, an hour of bookkeeping — they feel like confessions, but they explain why a 44-hour fortnight produced 40 billable hours. If you only write the billable rows, next quarter you will set a rate from a fortnight that never happened. The non-billable rows bill $0 and still count in the total hours, so the sheet tells the truth about both numbers. And if the client requires sign-off, a signature line at the bottom turns the sheet into an approved record instead of your word against theirs.
The overtime trap (never average the two weeks)
Here is the trap a biweekly sheet exists to prevent. Under the federal Fair Labor Standards Act, a covered employee who works more than 40 hours in a workweek must be paid at least one and a half times their regular rate for every hour past 40. The workweek is the unit — a fixed seven-day block — and the pay period is irrelevant to the calculation. Averaging the two weeks of a pay period to avoid overtime is not a gray area: for employers, it is a violation of the FLSA. Each workweek stands alone.
So a fortnight that totals 80 hours can still owe overtime. The table below is the whole trap in four rows — same 80-hour period, four different overtime answers:
| Week 1 + Week 2 | Period total | Overtime hours |
|---|---|---|
| 40 + 40 | 80 | 0 |
| 44 + 36 | 80 | 4 |
| 45 + 35 | 80 | 5 |
| 50 + 30 | 80 | 10 |
44 hours one week and 36 the next is 4 hours of overtime, not zero. The light second week never cancels the heavy first week. Put numbers on it, at an example rate of $50 an hour: the 44-hour week pays 40 hours at $50 ($2,000) plus 4 overtime hours at $75 ($300) — $2,300. The 36-hour week pays 36 at $50 — $1,800. The period pays $4,100. Average the two weeks instead, and the same 80 hours pay 80 at $50 — $4,000. The worker is $100 short, and the sheet that reported a single 80-hour total is the sheet that hid it.
Now the catch for freelancers: that law covers employees, not independent contractors. Nobody owes you overtime unless your contract says so. So write it into the contract before the extra hours happen, not after: hours over 40 in a week, or rush and after-hours work, bill at 1.5× your rate. Time and a half is the convention clients already understand, which is exactly why it works as a contract term — nobody has to be persuaded that 1.5 is fair. And the per-week split on the sheet is what makes that clause checkable: a single 80-hour period total hides which week the extra hours fell in, so the client cannot verify the overtime line and you cannot prove it.
Two more honest notes. First, a few states go further than the federal rule: California, Alaska, and Nevada also require overtime after 8 hours in a single day, and the per-week split on this sheet does not capture a daily trigger — if your contract has a daily clause, track it per day, not per week. Second, federal law has no weekend or holiday premium — only the 40-hour week counts. This page is general information, not legal or payroll advice; the rules that apply to you depend on your country, your state, and whether you are an employee or a contractor.
Week 1 vs week 2 (the pay-period boundary)
The boundary between the two weeks is a line on the sheet, not a feeling. Week 1 ends, week 2 begins, and each week’s rows stay in their own block. Never carry a row across the boundary to make the totals look tidier — a Thursday row moved into week 2 because week 1 looked heavy is exactly how a 44-hour week becomes a 40-hour week on paper, and the overtime with it.
The boundary is also where the workweek definition earns its keep. A workweek is a fixed, regularly recurring seven-day period, and the employer — or, for a freelancer, the client’s payroll — sets which day it starts. If the client’s workweek runs Sunday to Saturday and your sheet runs Monday to Sunday, the weeks misalign by a day, and every overtime split on the sheet is wrong by that day’s hours. Put the workweek in the header — “Workweek: Monday–Sunday” — and check it against the client’s payroll before the first row goes in, not after the first invoice goes out.
What if week 2 is light? Nothing changes. The light week never cancels the heavy week’s overtime, and the heavy week never borrows hours from the light one. Each week is totalled on its own, each week’s overtime is worked out on its own, and only then are the two weeks added together for the period total. That order — split first, add second — is the whole discipline of the biweekly sheet, and it is the one thing a single 14-day list cannot do.
The boundary also isolates disputes. If the client questions a line in week 2, the dispute never holds up week 1’s payment — week 1 is totalled, closed, and already invoiced or ready to be, and the argument is about one week’s rows, not the whole fortnight. The same applies across a month boundary: a two-week period that straddles the end of the month is invoiced by the period, not the month. Splitting a period across two monthly invoices means neither invoice matches a sheet, and the client cannot check either one. The month-end close can wait a few days; the period’s invoice cannot.
From timesheet to invoice
The timesheet is the input; the invoice is the output. Here is what a filled-in fortnight looks like — two clients, two weeks, one sheet, with a subtotal per client per week and a total per week, so either week can be checked on its own:
| Date | Client | Project | Description | Hours | Rate | Billable | Amount |
|---|---|---|---|---|---|---|---|
| Mon Nov 2 | Acme Co | Website redesign | Homepage layout — hero, services, testimonials | 3.50 | $80 | Yes | $280 |
| Tue Nov 3 | Acme Co | Website redesign | Client call + revisions, round 1 | 2.25 | $80 | Yes | $180 |
| Wed Nov 4 | Beta LLC | Logo refresh | Initial concepts, three directions | 2.00 | $90 | Yes | $180 |
| Thu Nov 5 | Acme Co | Website redesign | Contact + pricing pages | 4.00 | $80 | Yes | $320 |
| Fri Nov 6 | Acme Co | Website redesign | Final revisions + handover notes | 2.75 | $80 | Yes | $220 |
| Week 1 total | 14.50 | 14.50 billable | $1,180 | ||||
| Mon Nov 9 | Acme Co | Website redesign | Phase 2 kickoff + sitemap | 3.00 | $80 | Yes | $240 |
| Tue Nov 10 | Beta LLC | Logo refresh | Revisions, round 1 | 2.50 | $90 | Yes | $225 |
| Wed Nov 11 | Acme Co | Website redesign | Blog templates | 3.50 | $80 | Yes | $280 |
| Thu Nov 12 | Acme Co | Admin | Proposal for phase 3 (not billed) | 1.00 | $80 | No | $0 |
| Fri Nov 13 | Beta LLC | Logo refresh | Final files + brand notes | 1.50 | $90 | Yes | $135 |
| Week 2 total | 11.50 | 10.50 billable | $880 | ||||
| Period total | 26.00 | 25.00 billable | $2,060 |
Two invoices come off this one sheet: Acme Co for $1,520 (19.00 hours across the two weeks) and Beta LLC for $540 (6.00 hours). Each invoice is one client’s period total, already computed, with its own lines — one line per project per week, showing the hours, the rate, and the amount, with the description from the timesheet becoming the invoice line description. Listing week 1 and week 2 on separate lines matters: the client can check either week against its block on the sheet without re-adding the fortnight. If the client pays weekly instead of biweekly, send one invoice per client per week instead — the sheet already carries the per-week subtotals, so the same rows produce four smaller invoices with no extra work. Never mix two clients on one invoice, and never mix two periods: a client who disputes week two should not be able to hold week one hostage.
Attach the timesheet as backup. The invoice is the bill; the timesheet is the proof. Clients pay itemized invoices with the record attached, and argue with lump sums that have none. Send it the day the period closes — an invoice sent Friday of week 2 gets paid noticeably faster than one batched at month-end, because the value is still fresh. For the invoice itself, read how to write an invoice — the line items, the numbering, and the payment terms that belong on every bill. The timesheet tells you what to charge; the guide tells you how to present it.
How to use it free
- Copy the column layout above into a spreadsheet — Excel, Google Sheets, or Numbers all work — or print the blank layout and fill it in by hand. One file per period, named so you can find it later (2026-11-02-fortnight, for example).
- Fill in the header: your name or business, the two weeks the sheet covers, your rates, your rounding policy (“15-minute increments, rounded up”), and the workweek definition (“Workweek: Monday–Sunday”).
- Log each block of work the day you do it, in decimal hours, one row per day per client and project, with a description the client would recognize.
- At the end of week 1, total week 1 before starting week 2 — a subtotal per client, then the week total. Do not wait until day 14 to total either week.
- At the end of week 2, total week 2 the same way, then add the two week totals into the period total — total hours, billable hours, and the amount. Check the non-billable rows are still there and the rounding policy was applied the same way on every row.
- Turn each client’s period total into an invoice with Billia’s free invoice generator — the billable hours become the line items, one line per project per week, the timesheet goes along as backup, and the PDF arrives in your inbox. No account, no watermark.
That is the whole system: a sheet you own, a habit that takes ten seconds a block, a week totalled while it is still fresh, and an invoice that writes itself from the period totals. Keep one more habit with it — save the finished timesheet with the invoices it produced, in the same folder, under the same name. Six months from now, when a client asks what that invoice was for, the answer is one search away.
Turn two weeks’ hours into an invoice
Your timesheet period totals are the line items. Billia’s free invoice generator turns them into a clean PDF — no signup, no watermark.
Create my invoice — freeFrequently asked questions
What should a biweekly timesheet include?
A header with your name or business, the two weeks the sheet covers, your rates, your rounding policy, and the workweek definition (which day the week starts); fourteen days of rows, one per day for each client and project, with the date, client, project, a specific description, the hours in decimals, the rate, and whether the row is billable; a subtotal per client per week; a total for each week; and a period total of total hours, billable hours, and the amount. Add a signature line when the client requires sign-off.
How is overtime calculated on a biweekly timesheet?
One workweek at a time, never averaged across the two weeks. Under the federal Fair Labor Standards Act, a covered (non-exempt) employee who works more than 40 hours in a single workweek must be paid at least 1.5 times their regular rate for every hour past 40 — so 44 hours one week and 36 the next is 4 hours of overtime, not zero, even though the fortnight totals 80. For freelancers, overtime applies only if the contract says so: write hours over 40 in a week at 1.5 times your rate into the contract before the extra hours happen. A few states add a daily overtime trigger, so check the rules where you work; this page is general information, not legal advice.
Should I use one sheet or two for two weeks?
One sheet, two week-blocks. Two separate sheets lose the period total and make the boundary between the weeks invisible — and a single 14-day list with no weekly split hides the overtime, because there is no per-week total to check against 40 hours. The two-blocks-on-one-sheet layout is the whole point of a biweekly timesheet: each week totalled on its own, then added together for the period.
How does a timesheet become an invoice?
Total the billable hours per client for the period — each week’s subtotal is already on the sheet — then put one line per project per week on the invoice with the hours, the rate, and the amount. Send one invoice per client for the period (or one per client per week, if the client pays weekly), attach the timesheet as backup, and send it the day the period closes. Billia’s free invoice generator turns those line items into a clean PDF — no account, no watermark.