Home › Estimate templates › Roofing

Roofing Estimate Template

A roofing estimate prices the roof by the square — 100 square feet of roof surface — and shows the measurement first, so the homeowner can check the math before the price.

Most estimates sell labor. A roofing estimate sells a measurement. The roof is measured in squares, the waste is added before anything is priced, and then every part of the roof gets its own line: tear-off by the layer, shingles with the brand and line named, underlayment, ice and water shield, flashing, ridge vent, and the labor to install it all, each priced per square. A one-liner that just says “new roof” with a price cannot be compared with anything — and a homeowner holding three bids will throw it out first. Billia’s free roofing estimate template is built measurement-first — footprint times pitch factor, the waste stated on the quote, decking as an if-needed line, the permit and disposal on their own lines, and a place for the insurance claim. Build it in the free estimate maker in about a minute — no account, no watermark.

What makes a roofing estimate different

On most trades, the estimate lists hours and materials. On a roof, the estimate starts with geometry. The roof’s surface is bigger than the house’s footprint, because the pitch stretches it: a 2,000-square-foot footprint under a 6/12 pitch is 2,236 square feet of roof surface, and that is the number everything is priced from. Divide by 100 and you have the squares — 22.36 here — and the waste goes on top of the shingles only, never on the tear-off or the labor, because nobody installs the waste.

The pitch factor is geometry, not a price, and it is worth printing on the estimate itself:

PitchFactorWhat it means
4/121.054Gentle slope; multiply the footprint by 1.054
6/121.118Common residential pitch
8/121.202Steep — the steep-pitch labor line starts here
9/121.250Steep; slower crew, more staging
12/121.414Very steep; specialist pricing

Worked example, so the homeowner can follow it: a 2,000-square-foot footprint at 6/12 gives 2,000 × 1.118 = 2,236 square feet of roof surface, or 22.36 squares. Add 10% waste on the shingles — 22.36 × 1.10 = 24.6 — and order 25 squares. Three bundles cover a square, so that is 75 bundles. Tear-off and labor stay at the measured 22.36 squares. When the measurement is on the page, the price stops being a mystery and starts being arithmetic the homeowner can verify.

What to include on a roofing estimate

SectionWhat goes in it
Measurement, shownFootprint, pitch and pitch factor, roof surface in squares, waste percentage — the math the price rests on
Tear-off, by layerOne line per layer coming off, priced per square, plus dumpster and dump fees
Shingles, namedBrand and product line, waste-adjusted quantity in squares, bundles — never just “shingles”
UnderlaymentSynthetic underlayment by the square, on the waste-adjusted area
Ice and water shieldAt the eaves and in the valleys, by the roll
Flashing & drip edgeStep flashing, valley flashing, drip edge, pipe boots — each on its own line
VentilationRidge vent and intake, by the linear foot
LaborInstallation labor priced per square, crew size and days on site, plus the steep-pitch line at 8/12 or more
Decking, if neededReplacement decking as an if-needed line with a per-sheet price agreed in advance, with photos before the work
Permit & disposalPermit fee passed through at cost; dumpster and dump fees on their own lines
Valid-until dateThe date the price stops holding — 30 days is the common default on a reroof
What’s not includedGutters, chimney masonry, skylight replacement — written out, not assumed
Insurance-claim lineClaim number, insurer, and the scope the adjuster approved, so the estimate matches the claim file

For a sense of scale, 2026 national averages put an installed asphalt shingle roof at about $340 to $595 per square (RoofingCalculator, November 2026), with labor alone at about $150 to $300 per square (SquareDash, April 2026), and tear-off at roughly $100 to $150 per square per layer. Those are national averages, not a price guide — local labor rates, the pitch, and the number of layers move the number a lot, and every figure on a real estimate should be your own rate. The point of the ranges is to show the homeowner that the total is built from priced parts, not pulled from the air.

The waste factor: 10–15% on the shingles

Waste is the line homeowners question most and roofers forget to explain. Shingles are cut at hips, valleys, ridges, and edges, and the offcuts cannot be reused, so the order has to be bigger than the roof. Ten percent covers a plain gable. A roof with hips and valleys runs closer to 15%, and a cut-up roof with dormers and skylights can need up to 20%. The waste goes on the shingles — and on the underlayment, which follows the same area — and nowhere else: tear-off is priced on the measured squares, because the old roof is already there, and labor is priced on the measured squares, because nobody installs the waste.

State the waste on the quote, not in a footnote. “24.6 squares of shingles ordered for a 22.36-square roof — 10% waste” is a sentence the homeowner understands, and it is the sentence that stops the argument about why the material quantity is bigger than the roof. Round the order up to whole squares, because suppliers sell bundles, not fractions: a crew that runs two bundles short at 3 pm loses the rest of the day.

Validity periods: 30 days is the common default

A roofing estimate holds for 30 days because the material price behind it can move in that time — shingle prices follow the manufacturer’s price book, not your schedule. Print the date on the estimate itself, next to the total, not buried in an email thread. After the date passes, re-confirm the material price before honoring the number: honoring a stale price on a full reroof is how a profitable job turns into a loss, and re-quoting after the date is expected, not rude. The date protects both sides — the homeowner knows the price is real, and you are not locked into a number the supplier no longer honors. When material prices are moving fast, a shorter validity — 14 days — is the honest choice, and the estimate should say so.

The insurance-claim line

Storm-damage jobs come with a second document: the claim. The estimate should carry a line for it — the claim number, the insurer, and the scope the adjuster approved — so the estimate and the claim file describe the same job. That line is documentation, not insurance advice: it records what was approved and prices the work to that scope, and if the adjuster approves more work later, a revised estimate follows. For the homeowner, it is the proof that the roofer read the claim before pricing. For the roofer, it is the paper trail that the work done is the work approved.

How to make one free with Billia

  1. Open the free estimate maker and enter your business and client details.
  2. Add the measurement first — footprint, pitch, squares, and waste — then tear-off by the layer, the shingles with the brand and line named, underlayment, flashing, ventilation, and labor, each on its own line.
  3. Add decking as an if-needed line with a per-sheet price, the permit and disposal on their own lines, and the valid-until date (30 days is the common default).
  4. Enter your email: we send the PDF right away, and you can also download it directly. No account needed.

Prefer Word, Excel, or Google Docs? Use the layout above as your reference — or skip the formatting and generate the PDF directly.

Still settling your rates? How much to charge for roofing repair has the repair anchors, and the roofing cost calculator turns a footprint and a pitch into squares and a price range. Starting a roofing business of your own? Read how to start a roofing business — the insurance-first setup, licensing, and startup costs.

Estimate the roof in 60 seconds

Free. No account. No watermark. Just a professional PDF.

Create my estimate — free

Frequently asked questions

How do you price a roofing estimate?

Measure the roof in squares — footprint times the pitch factor, divided by 100 — then add waste to the shingles (10% on a plain gable, 15% with hips and valleys) and price each section per square: tear-off by the layer, materials, and labor. The permit and disposal go on their own lines, and the valid-until date sits next to the total.

What is a square in roofing?

One square is 100 square feet of roof surface. Roofers price and order materials by the square, so a 2,000-square-foot roof surface is 20 squares before waste. Three bundles of shingles cover one square.

How long should a roofing estimate be valid?

30 days is the common default for a full reroof, because material prices can move. Print the date on the estimate next to the total. After it passes, re-confirm the material price before honoring the number — and when prices are moving fast, a 14-day validity is the honest choice.

Should tear-off be a separate line?

Yes — one line per layer coming off, priced per square, with the dumpster and dump fees alongside it. Hiding tear-off inside labor is how the homeowner discovers a second layer mid-job, and how a fixed-price job turns into an argument about who pays for it.